Shipment Lead-Times

PolyPro FR is made in sheet or roll form.  The following chart indicates the standard shipment lead-times for raw material and fabricated parts.

Raw Material

Thickness   Lead-Time  
.010" 
(.25mm)
  1 - 2 Days  
.017" 
(.43mm)
  1 - 2 Days  
.030" 
(.79mm)
  1 - 2 Days  
.040" 
(1.01mm)
  1 - 2 Days  
.062" 
(1.57mm)
  1 - 2 Days  
.094" 
(2.39mm)
  4 - 6 Weeks  
.125" 
(3.17mm)
  4 - 6 Weeks  

 

Fabricated Parts

Some fabricated parts require special tooling to make the part per the drawing.  In the cases that existing tooling can be used to make a part, the shipment lead-time will be faster than in the cases in which special or custom tooling must be purchased.

Thickness   Existing Tooling Tooling Required
.010" 
(.25mm)
  1 - 2 Days 1 - 2 Weeks
.017" 
(.43mm)
  1 - 2 Days 1 - 2 Weeks
.030" 
(.79mm)
  1 - 2 Days 1 - 2 Weeks
.040" 
(1.01mm)
  1 - 2 Days 1 - 2 Weeks
.062" 
(1.57mm)
  1 - 2 Days 3 - 4 Weeks
.094" 
(2.39mm)
  4 - 6 Weeks 5 - 7 Weeks
.125" 
(3.17mm)
  4 - 6 Weeks 5 - 7 Weeks

 