Shipment Lead-TimesPolyPro FR™ is made in sheet or roll form.
The following chart indicates the standard shipment
lead-times for raw material and fabricated parts.
Raw Material
| Thickness |
|
Lead-Time |
|
.010"
(.25mm) |
|
1 - 2 Days |
|
.017"
(.43mm) |
|
1 - 2 Days |
|
.030"
(.79mm) |
|
1 - 2 Days |
|
.040"
(1.01mm) |
|
1 - 2 Days |
|
.062"
(1.57mm) |
|
1 - 2 Days |
|
.094"
(2.39mm) |
|
4 - 6 Weeks |
|
.125"
(3.17mm) |
|
4 - 6 Weeks |
|
Fabricated Parts
Some fabricated parts require special tooling
to make the part per the drawing. In the cases that existing
tooling can be used to make a part, the shipment lead-time will be
faster than in the cases in which special or custom tooling must be
purchased.
| Thickness |
|
Existing Tooling |
Tooling Required |
.010"
(.25mm) |
|
1 - 2 Days |
1 - 2 Weeks |
.017"
(.43mm) |
|
1 - 2 Days |
1 - 2 Weeks |
.030"
(.79mm) |
|
1 - 2 Days |
1 - 2 Weeks |
.040"
(1.01mm) |
|
1 - 2 Days |
1 - 2 Weeks |
.062"
(1.57mm) |
|
1 - 2 Days |
3 - 4 Weeks |
.094"
(2.39mm) |
|
4 - 6 Weeks |
5 - 7 Weeks |
.125"
(3.17mm) |
|
4 - 6 Weeks |
5 - 7 Weeks |
|